... continue . Even growth that is quite modest by historical stand- ards would mandate new plants - that have not been ordered yet - coming online in the 1990's . Replacement of aging plants will call for still more new generating capacity ...
... continue . Even growth that is quite modest by historical stand- ards would mandate new plants - that have not been ordered yet - coming online in the 1990's . Replacement of aging plants will call for still more new generating capacity ...
الصفحة 4
... continue to fall below projections . A utility may commit large sums of capital to a plant only to find part way ... continues to tighten restrictions and mandate major changes in plant designs . Although the reasons for these changes ...
... continue to fall below projections . A utility may commit large sums of capital to a plant only to find part way ... continues to tighten restrictions and mandate major changes in plant designs . Although the reasons for these changes ...
الصفحة 16
... continue to change until these are addressed adequately . The design and operation of LWRS has un- questionably improved over time . The training of operators has been upgraded , human factors considerations have been incorporated into ...
... continue to change until these are addressed adequately . The design and operation of LWRS has un- questionably improved over time . The training of operators has been upgraded , human factors considerations have been incorporated into ...
الصفحة 31
... continue . With equally plausible assumptions , however , electricity load growth could resume at rates of 3 to 4 percent per year . The sources of uncertainty are described in the next section . The third section explains why utilities ...
... continue . With equally plausible assumptions , however , electricity load growth could resume at rates of 3 to 4 percent per year . The sources of uncertainty are described in the next section . The third section explains why utilities ...
الصفحة 32
... continue to behave like other forms of en- ergy for which ratios to GNP have dropped stead- ily since 1973 . The sources of uncertainty in electricity de- mand forecasts are very evident from a look at Figure 5. - A Comparison of the ...
... continue to behave like other forms of en- ergy for which ratios to GNP have dropped stead- ily since 1973 . The sources of uncertainty in electricity de- mand forecasts are very evident from a look at Figure 5. - A Comparison of the ...
طبعات أخرى - عرض جميع المقتطفات
عبارات ومصطلحات مألوفة
accident at Three analysis Atomic Atomic Industrial Forum average backfits capacity factor capital cost changes chapter coal plants cogeneration commercial Commission components concerns construction costs coolant core CWIP decay heat developed discussed dollars economic elec Electric Utility electricity demand electricity prices engineering environmental estimates Federal fission fuel future growth rates hearings heat HTGR impact improve increase inflation INPO Institute ities leadtimes less licensing Light Water Reactors load Maine Yankee major ment nuclear energy nuclear industry nuclear plants nuclear power nuclear reactors Nuclear Regulatory Commission nuclear units option percent Photo credit powerplants pressurized water reactor problems projects proposed rate base rate regulation reac reduce regulatory reliability requirements risk safe safety issues SOURCE standards steam Strategy struction technical Three Mile Island tion tricity U.S. Nuclear uncertainty utility management vendors
مقاطع مشهورة
الصفحة 154 - ... provide adequate protection to the health and safety of the public.
الصفحة 172 - Individual members of the public should be provided a level of protection from the consequences of nuclear power plant operation such that individuals bear no significant additional risk to life and health.
الصفحة 8 - Administrator to the House Committee on Science and Technology and the Senate Committee on Energy and Natural Resources upon the request of either such committee.
الصفحة 91 - PWR steam generators have shown evidence of corrosion-induced wastage, cracking, reduction in tube diameter, and vibration-induced fatigue cracks. The primary concern is the capability of degraded tubes to maintain their integrity during normal operation and under accident conditions with adequate safety margins.
الصفحة 77 - The Future of Electric Power in America: Economic Supply for Economic Growth," DOE/PE-0045, US Department of Energy, June 1983 (B).
الصفحة 173 - The risk to an average individual in the vicinity of a nuclear power plant of prompt fatalities that might result from reactor accidents should not exceed one-tenth of one percent (0.1 percent) of the sum of prompt fatality risks resulting from other accidents to which members of the US population are generally exposed.
الصفحة 78 - 8th Annual Review of Overall Reliability and Adequacy of the North American Bulk Power Systems
الصفحة 172 - Societal risks to life and health from nuclear power plant operation should be comparable to or less than the risks of generating electricity by viable competing technologies and should not be a significant addition to other societal risks.