Nuclear Power in an Age of UncertaintyCongress of the U.S., Office of Technology Assessment, 1984 - 293 من الصفحات |
من داخل الكتاب
النتائج 1-5 من 82
الصفحة
... Engineering Library NUCLEAR POWER in an age of UNCERTAINTY CONGRESS OF THE UNITED STATES Office of Technology Assessment Washington DC 20510 Office of Technology Assessment Congressional Board of the 98th Congress. Y3 . T 22/2 : 2 N ...
... Engineering Library NUCLEAR POWER in an age of UNCERTAINTY CONGRESS OF THE UNITED STATES Office of Technology Assessment Washington DC 20510 Office of Technology Assessment Congressional Board of the 98th Congress. Y3 . T 22/2 : 2 N ...
الصفحة
... Washington DC 20510 of Michigan Engineering Library UNIVERSITY OF MICHIGAN LIBRARIES MAY 16 1984 DEPOSITED BY THE UNITED STATES OF AMERICA HD 9698 • 452 N8351 1984 Recommended Citation : Nuclear 4 3.T 22/2 : 2103574 1070 - M.
... Washington DC 20510 of Michigan Engineering Library UNIVERSITY OF MICHIGAN LIBRARIES MAY 16 1984 DEPOSITED BY THE UNITED STATES OF AMERICA HD 9698 • 452 N8351 1984 Recommended Citation : Nuclear 4 3.T 22/2 : 2103574 1070 - M.
الصفحة
... Engineers & Contractors , Inc. Alfred Amerosi , Consultant , Downers Grove , III . James J. MacKenzie , Union of Concerned Scientists Mark Mills , Science Concepts Joanne Sedor , Office of Technology Assessment Richard Lester ...
... Engineers & Contractors , Inc. Alfred Amerosi , Consultant , Downers Grove , III . James J. MacKenzie , Union of Concerned Scientists Mark Mills , Science Concepts Joanne Sedor , Office of Technology Assessment Richard Lester ...
الصفحة
... Engineers & Constructors , Inc. James Edmonds Institute for Energy Analysis Victor Gilinsky U.S. Nuclear Regulatory Commission Eric Hirst Oak Ridge National Laboratory Leonard Hyman Merrill Lynch , Pierce , Fenner & Smith Henry Kelly ...
... Engineers & Constructors , Inc. James Edmonds Institute for Energy Analysis Victor Gilinsky U.S. Nuclear Regulatory Commission Eric Hirst Oak Ridge National Laboratory Leonard Hyman Merrill Lynch , Pierce , Fenner & Smith Henry Kelly ...
الصفحة
... Engineering and Louisiana Power & Light Co. Wendell Kelley Chairman and CEO Illinois Power Co. T. C. Nichols Senior Vice President , Power Operations South Carolina Electric & Gas Co. Warren Owen Senior Vice President Duke Power Co ...
... Engineering and Louisiana Power & Light Co. Wendell Kelley Chairman and CEO Illinois Power Co. T. C. Nichols Senior Vice President , Power Operations South Carolina Electric & Gas Co. Warren Owen Senior Vice President Duke Power Co ...
طبعات أخرى - عرض جميع المقتطفات
عبارات ومصطلحات مألوفة
accident at Three analysis Atomic Atomic Industrial Forum average backfits capacity factor capital cost changes chapter coal plants cogeneration commercial Commission components concerns construction costs coolant core CWIP decay heat developed discussed dollars economic elec Electric Utility electricity demand electricity prices engineering environmental estimates Federal fission fuel future growth rates hearings heat HTGR impact improve increase inflation INPO Institute ities leadtimes less licensing Light Water Reactors load Maine Yankee major ment nuclear energy nuclear industry nuclear plants nuclear power nuclear reactors Nuclear Regulatory Commission nuclear units option percent Photo credit powerplants pressurized water reactor problems projects proposed rate base rate regulation reac reduce regulatory reliability requirements risk safe safety issues SOURCE standards steam Strategy struction technical Three Mile Island tion tricity U.S. Nuclear uncertainty utility management vendors
مقاطع مشهورة
الصفحة 154 - ... provide adequate protection to the health and safety of the public.
الصفحة 172 - Individual members of the public should be provided a level of protection from the consequences of nuclear power plant operation such that individuals bear no significant additional risk to life and health.
الصفحة 8 - Administrator to the House Committee on Science and Technology and the Senate Committee on Energy and Natural Resources upon the request of either such committee.
الصفحة 91 - PWR steam generators have shown evidence of corrosion-induced wastage, cracking, reduction in tube diameter, and vibration-induced fatigue cracks. The primary concern is the capability of degraded tubes to maintain their integrity during normal operation and under accident conditions with adequate safety margins.
الصفحة 77 - The Future of Electric Power in America: Economic Supply for Economic Growth," DOE/PE-0045, US Department of Energy, June 1983 (B).
الصفحة 173 - The risk to an average individual in the vicinity of a nuclear power plant of prompt fatalities that might result from reactor accidents should not exceed one-tenth of one percent (0.1 percent) of the sum of prompt fatality risks resulting from other accidents to which members of the US population are generally exposed.
الصفحة 78 - 8th Annual Review of Overall Reliability and Adequacy of the North American Bulk Power Systems
الصفحة 172 - Societal risks to life and health from nuclear power plant operation should be comparable to or less than the risks of generating electricity by viable competing technologies and should not be a significant addition to other societal risks.
الصفحة 285 - Load factor. Load factor is the ratio of the average load over a designated period of time to the connected load.