... experience of many organiza- tions and individuals . In particular , we appreciate the generous assistance of our dis- tinguished advisory panel and workshop participants , as well as the efforts of the proj- ect's consultants and ...
... experience of many organiza- tions and individuals . In particular , we appreciate the generous assistance of our dis- tinguished advisory panel and workshop participants , as well as the efforts of the proj- ect's consultants and ...
الصفحة 6
... experience is still too limited for all the potential problems to have been identified . Accidents at Three Mile Island and at the Browns Ferry reactor in- volved sequences of events that were not un- derstood clearly enough until they ...
... experience is still too limited for all the potential problems to have been identified . Accidents at Three Mile Island and at the Browns Ferry reactor in- volved sequences of events that were not un- derstood clearly enough until they ...
الصفحة 8
... experiences of the best man- aged plants , there would be much less concern over the future prospects for the nuclear option . It is the intent of this study to explore these possibilities in the light of the different interests and ...
... experiences of the best man- aged plants , there would be much less concern over the future prospects for the nuclear option . It is the intent of this study to explore these possibilities in the light of the different interests and ...
الصفحة 9
... experiences in con- struction costs and schedules and in reac- tor operation , new measures that may im- prove quality control ( e.g. , the Institute for Nuclear Power Operations ) , and further steps that could be implemented if ...
... experiences in con- struction costs and schedules and in reac- tor operation , new measures that may im- prove quality control ( e.g. , the Institute for Nuclear Power Operations ) , and further steps that could be implemented if ...
الصفحة 14
... experience and ability of utility and construction managers . Only the best Photo credit : United Engineers & Constructors managed construction projects are now compet- itive with new coal. 14. Nuclear Power in an Age of Uncertainty.
... experience and ability of utility and construction managers . Only the best Photo credit : United Engineers & Constructors managed construction projects are now compet- itive with new coal. 14. Nuclear Power in an Age of Uncertainty.
طبعات أخرى - عرض جميع المقتطفات
عبارات ومصطلحات مألوفة
accident at Three analysis Atomic Atomic Industrial Forum average backfits capacity factor capital cost changes chapter coal plants cogeneration commercial Commission components concerns construction costs coolant core CWIP decay heat developed discussed dollars economic elec Electric Utility electricity demand electricity prices engineering environmental estimates Federal fission fuel future growth rates hearings heat HTGR impact improve increase inflation INPO Institute ities leadtimes less licensing Light Water Reactors load Maine Yankee major ment nuclear energy nuclear industry nuclear plants nuclear power nuclear reactors Nuclear Regulatory Commission nuclear units option percent Photo credit powerplants pressurized water reactor problems projects proposed rate base rate regulation reac reduce regulatory reliability requirements risk safe safety issues SOURCE standards steam Strategy struction technical Three Mile Island tion tricity U.S. Nuclear uncertainty utility management vendors
مقاطع مشهورة
الصفحة 154 - ... provide adequate protection to the health and safety of the public.
الصفحة 172 - Individual members of the public should be provided a level of protection from the consequences of nuclear power plant operation such that individuals bear no significant additional risk to life and health.
الصفحة 8 - Administrator to the House Committee on Science and Technology and the Senate Committee on Energy and Natural Resources upon the request of either such committee.
الصفحة 91 - PWR steam generators have shown evidence of corrosion-induced wastage, cracking, reduction in tube diameter, and vibration-induced fatigue cracks. The primary concern is the capability of degraded tubes to maintain their integrity during normal operation and under accident conditions with adequate safety margins.
الصفحة 77 - The Future of Electric Power in America: Economic Supply for Economic Growth," DOE/PE-0045, US Department of Energy, June 1983 (B).
الصفحة 173 - The risk to an average individual in the vicinity of a nuclear power plant of prompt fatalities that might result from reactor accidents should not exceed one-tenth of one percent (0.1 percent) of the sum of prompt fatality risks resulting from other accidents to which members of the US population are generally exposed.
الصفحة 78 - 8th Annual Review of Overall Reliability and Adequacy of the North American Bulk Power Systems
الصفحة 172 - Societal risks to life and health from nuclear power plant operation should be comparable to or less than the risks of generating electricity by viable competing technologies and should not be a significant addition to other societal risks.
الصفحة 285 - Load factor. Load factor is the ratio of the average load over a designated period of time to the connected load.