...ratings of the load consuming apparatus connected to the system or any part thereof. (b) Load factor. Load factor Is the ratio of the average load over a designated period of time to the connected load. (c) Peak load. Peak load Is the maximum load consumed or produced... | |
| 1976 - عدد الصفحات: 184
...ratings of the load consuming apparatus connected to the system or any part thereof. (b) Load factor. Load factor is the ratio of the average load over a designated period of time to the connected load. (c) Peak load. Peak load is the maximum load consumed or produced... | |
| United States. Coast Guard - 1967 - عدد الصفحات: 156
...the load consuming apparatus connected to the system or any part thereof. 110.15-85(b) Load factor. Load factor is the ratio of the average load over a designated period of time to the connected load. 110.15785(c) Peak load. Peak load is the maximum load consumed... | |
| Colin Bayliss, Brian Hardy - 1999 - عدد الصفحات: 978
...Utilization tactor, UF = — : — (normally < 1) Rated capacity of the system 23.2.5 Load factor (LDF) The load factor is the ratio of the average load over a designated period of time to the peak load occurring in that period.' To accurately define the load factor then... | |
| United States. Congress. Office of Technology Assessment - 1984 - عدد الصفحات: 299
...fuel rods to regulate the nuclear chain reaction. Control rods are composed of material that absorbs neutrons readily. They interrupt or slow down a chain...period. Also used as a synonym for capacity factor. load eye/e pattern is the variation in demand over a specified period of time. loss-of-coolant accident... | |
| عدد الصفحات: 299
...time. Base Load is the normal, relatively constant demand for energy on a given system. Peakloadis the highest demand for energy from a supplying system,...period to the peak load occurring during that period. Load Cycle Pattern is the variation in demand over a specified period of time. Maintenance Power: Energy... | |
| United States. Bonneville Power Administration - 1965 - عدد الصفحات: 78
...utilities. general rule, it costs less to supply power to chaser who buys at high load factor. The load factor is the ratio of the average load over a designated period, such as a month, to the peak load occurring in that period. Our industrial customers buy at... | |
| 1972 - عدد الصفحات: 666
...ratings of the load consuming apparatus connected to the system or any part thereof. (b) Load factor. Load factor is the ratio of the average load over a designated period of time to the connected load. (c) Peak load. Peak load is the maximum load consumed or produced... | |
| United States. Congress. Senate. Interior and Insular - 1957 - عدد الصفحات: 76
...Standard« Association approved definitions of load factor and plant factor are an follows: "Load factor: Load factor is the ratio of the average load over a designated period of time to the peak load occurring in that period. "Plant factor: The plant factor is the ratio... | |