الحقول المخفية
الكتب الكتب
" Load factor. Load factor is the ratio of the average load over a designated period of time to the connected load. "
Nuclear Power in an Age of Uncertainty - الصفحة 285
بواسطة United States. Congress. Office of Technology Assessment - 1984 - عدد الصفحات: 293
عرض كامل - لمحة عن هذا الكتاب

The Code of Federal Regulations of the United States of America

1976 - عدد الصفحات: 252
...ratings of the load consuming apparatus connected to the system or any part thereof. (b) Load factor. Load factor Is the ratio of the average load over a designated period of time to the connected load. (c) Peak load. Peak load Is the maximum load consumed or produced...

Code of Federal Regulations: Containing a Codification of Documents of ...

1976 - عدد الصفحات: 184
...ratings of the load consuming apparatus connected to the system or any part thereof. (b) Load factor. Load factor is the ratio of the average load over a designated period of time to the connected load. (c) Peak load. Peak load is the maximum load consumed or produced...

Electrical Engineering Regulations: Subchapter J. (Title 46, C.F.R., Parts ...

United States. Coast Guard - 1967 - عدد الصفحات: 156
...the load consuming apparatus connected to the system or any part thereof. 110.15-85(b) Load factor. Load factor is the ratio of the average load over a designated period of time to the connected load. 110.15785(c) Peak load. Peak load is the maximum load consumed...

Transmission and Distribution Electrical Engineering

Colin Bayliss, Brian Hardy - 1999 - عدد الصفحات: 978
...Utilization tactor, UF = — : — (normally < 1) Rated capacity of the system 23.2.5 Load factor (LDF) The load factor is the ratio of the average load over a designated period of time to the peak load occurring in that period.' To accurately define the load factor then...
معاينة محدودة - لمحة عن هذا الكتاب

Nuclear Power in an Age of Uncertainty: Summary

United States. Congress. Office of Technology Assessment - 1984 - عدد الصفحات: 299
...fuel rods to regulate the nuclear chain reaction. Control rods are composed of material that absorbs neutrons readily. They interrupt or slow down a chain...period. Also used as a synonym for capacity factor. load eye/e pattern is the variation in demand over a specified period of time. loss-of-coolant accident...

Industrial and commercial cogeneration.

عدد الصفحات: 299
...time. Base Load is the normal, relatively constant demand for energy on a given system. Peakloadis the highest demand for energy from a supplying system,...period to the peak load occurring during that period. Load Cycle Pattern is the variation in demand over a specified period of time. Maintenance Power: Energy...

Report of the Administrator to the Secretary of the Interior

United States. Bonneville Power Administration - 1965 - عدد الصفحات: 78
...utilities. general rule, it costs less to supply power to chaser who buys at high load factor. The load factor is the ratio of the average load over a designated period, such as a month, to the peak load occurring in that period. Our industrial customers buy at...

The Code of Federal Regulations of the United States of America

1972 - عدد الصفحات: 666
...ratings of the load consuming apparatus connected to the system or any part thereof. (b) Load factor. Load factor is the ratio of the average load over a designated period of time to the connected load. (c) Peak load. Peak load is the maximum load consumed or produced...

Burns Creek Dam and Power-plant, Upper Snake River, Idaho

United States. Congress. Senate. Interior and Insular - 1957 - عدد الصفحات: 76
...Standard« Association approved definitions of load factor and plant factor are an follows: "Load factor: Load factor is the ratio of the average load over a designated period of time to the peak load occurring in that period. "Plant factor: The plant factor is the ratio...

The Code of Federal Regulations of the United States of America

1968 - عدد الصفحات: 574
...ratings of the load consuming apparatus connected to the system or any part thereof. (b) Load factor. Load factor is the ratio of the average load over a designated period of time to the connected load. (c) Peak load. Peak load is the maximum load consumed or produced...




  1. مكتبتي
  2. مساعدة
  3. بحث متقدم في الكتب
  4. التنزيل بتنسيق EPUB
  5. التنزيل بتنسيق PDF